Coal mine wastewater


  •  Coal mine wastewater

  • Detailed introduction

Project name: a coal to liquid branch of Zhongwei

Project indirection:

A coal to oil branch is a state-owned enterprise manufacturing formaldehyde and oil. Among them, the production waste water of the gas making workshop is gray water, and the water volume is about 100t/h about. A famous brand of membrane was used in the factory, and a large number of broken wires and scaling occurred. As shown in the figure:

 5.jpg

To ensure the production water in the gas making workshop The ash water MBR of 1 # membrane tank was replaced and the backwashing system was added.

Design water yield

86m three /h

Design flux

10L/m two · h

Design effluent turbidity

Less than 4NTU

Run Time

24-hour continuous operation

Actual water yield

More than 86m three /h. Considering the water inflow, the design water yield has been reached when the valve is half opened

Turbidity of produced water in actual operation

Less than 1NTU

Number of bellows

8 sets, each containing 54 MW20b diaphragms


The relevant installation pictures are as follows:

  4.jpg

Raw water quality diagram (grey water)

  2.jpg   3.jpg

Diaphragm installation drawing of diaphragm box

   

The main operation data statistics during the system test are as follows:

Water volume Reaching the design flow of 42m three /H Water yield data of each shift is shown in the table below

surface 1 Water yield data sheet of No. 1 membrane system

date

4.26—4.27

4.28-4.29

4.30-5.01

5.01-5.02

System water yield (m ³)

day shift

four hundred and three

four hundred and eleven

four hundred and eighty-seven

four hundred and thirty-six

night shift

four hundred and forty-five

four hundred and thirty

four hundred and eighty-eight

four hundred and forty-three

 

surface 2 Water yield data sheet of 2 # membrane system

date

5.4—5.5

5.5-5.6

5.7-5.8

5.9-5.10

System water yield (m ³)

day shift

four hundred and two

four hundred and sixteen

four hundred and thirty-nine

four hundred and three

night shift

three hundred and seventy-seven

four hundred and twenty-six

four hundred and sixty-nine

four hundred and forty-six

Note: Due to the large amount of data and little difference in daily water production, some of them are selected to show the water production capacity of the membrane


Negative pressure of membrane water production

The membrane load test is carried out after the installation is completed. At this time, the membrane has been running in the membrane tank for nearly one More than one month. When carrying out load test under sub conditions, we can see from the table above that the negative pressure has no obvious change over time and basically keeps floating near a straight line. This proves that Jiefu brand membrane can maintain a certain negative pressure under long-term operation conditions. one The negative pressure of No. 2 system under the design flow condition is zero point zero two six Attachment float, two The negative pressure of membrane system is at zero point zero one six Floating nearby. one No. 1 system is located at the side close to the pump house. Due to the problem of water flow direction, there may be more sludge at the bottom of the pool near the pump house, which is also caused by the factors of the self-priming pump itself two The negative pressure values of the system are different, but the negative pressure does not change significantly during the test, which indirectly indicates that the membrane has good anti pollution ability.

one Turbidity Data Sheet of No. 1 Membrane System

date

four point two six four point two seven

4.28-4.29

4.30-5.01

5.01-5.02

System turbidity( NTU

day shift

zero

zero

one

zero

night shift

zero

zero

one

zero

 

two Turbidity Data Sheet of No. 1 Membrane System

date

five point four five point five

5.5-5.6

5.7-5.8

5.9-5.10

System turbidity( NTU

day shift

zero

zero

one

one

night shift

one

one

one

one

It can be seen from the above table that the turbidity of the system is basically 2 and 1 data. Composite design requirements for turbidity. On May 3, the turbidity of No. 2 system rose to about 8. It was checked that the suction hose was loose during operation, which led to the suction of raw water in the pipe, which increased the turbidity. When the suction hose is tightened, the turbidity returns to 0. This proves that the filtration precision of the membrane meets the requirements and performs well.

key word: Coal mine wastewater , Mine wastewater , Coal mine wastewater treatment

Related products:

Related news:

 MBR membrane, ultrafiltration membrane manufacturer, water purification filter element

WeChat QR code

Zhejiang Headquarters:
 icon1.png Address: 370 Century Avenue, Chongfu Town Development Zone, Tongxiang, Zhejiang
 icon2.png Email: [email protected]
 icon4.png Tel.: 0573-88222777
 icon3.png Fax: 0573-88222622




Shanghai Sales Center:
 icon1.png Address: Room 2111, Greenland Hechuang Building, No. 450, Caoyang Road, Putuo District, Shanghai
 icon2.png Email: [email protected]
 icon4.png Tel.: 021-62586212
 icon3.png Fax: 021-62586271




  • Online Service
  • contact number
    eighteen billion three hundred and fifty-seven million two hundred and nine thousand two hundred and eighty-nine
  • Online Message
  • Mobile website
  • Online consultation
    Welcome to leave us a message
    Please enter your message here, and we will contact you as soon as possible.
    full name
    contacts
    Telephone
    Landline/mobile number
    mailbox
    mailbox
    address
    address